Despite the rain, we (mainly Bob and the fantastic builder,
Peter) have managed between the showers to finish almost all of the
projects. We actually did have about 6
days straight with no rain but then Cyclone Marcia in Queensland has given
Bellingen another solid week of rain.
The good thing is that this rain has not been the usual torrential
downpour and there hasn’t been any flooding.
The bad thing is that this rain has been quite relentless. Everything is going moldy. Bags stored in a cupboard in the house for just
a few weeks are covered in white specks.
We have been assured by our neighbours that Bellingen hasn’t had rain
this persistent for a very long time – just our luck to be here during the
wettest 4 months in years!
|
Swollen Boggy Creek |
|
Moldy backpack |
The big change to the house is the repair of the verandah
and extension of the roof so the weather stays off the wood and steps. It makes the house looks much bigger.
|
Bob and Peter working on the verandah |
|
Finished - almost - lattice to be added |
Inside the house we have painted and scrubbed, built new
wardrobes and cupboards, put new flooring or carpet throughout and added all
the bits of missing trim to finish off the edges that were never completed 20
years ago.
|
New floating floor with tiles |
|
New doors and shelves in the wardrobe |
|
New carpet in the bedroom |
We have doubled our water storage capacity by installing
another 5000 gallon water tank and adding some guttering to the workshop. It was quite an impressive sight watching the
delivery truck charging up the bush track then rolling the tank into place next
to the old cement one. The rain has also
revealed some drainage issues. We have
been having great fun digging trenches in the mud thinking Boggy Creek has
turned into the Somme.
|
New water tank |
|
Drain taking water away from the workshop - sump and piping to be added |
|
Trench taking overflow water from the dam |
Finally, after three weeks of delay due to the rain, the
storage container has arrived.
The sad
business of packing up again and handing over the house to good tenants
(fingers crossed) looms.
Not for the
first time have we shaken our heads at the irony of working so hard to make the
place nice only to leave it to tenants who may or may not maintain it.
|
Storage container being delivered in the rain, of course |
Just 5 more weeks before we return to Turkey but the time is
already being booked out – the kids coming for a visit (so excited!!), a trip
to Canberra for some final administrative chores, and surgery for Bob – but
these are for future blogs.
No comments:
Post a Comment